Vesgantti 101" V-Shaped Corner Couch Sectional, 7 Seat Customizable Modular by Vesgantti

Vesgantti 101" V-Shaped Corner Couch Sectional, 7 Seat Customizable Modular

$1,319.99
Sale price  $1,319.99 Regular price 
Skip to product information
Vesgantti 101" V-Shaped Corner Couch Sectional, 7 Seat Customizable Modular by Vesgantti

Vesgantti 101" V-Shaped Corner Couch Sectional, 7 Seat Customizable Modular

$1,319.99
Sale price  $1,319.99 Regular price 
Shipping calculated at checkout.

Product Overview

A ergonomic take on living rooms, the Vesgantti 101" V-Shaped Corner Couch Sectional, 7 Seat Customizable Modular Cloud Couches with Movable Ottoman, Chenille Deep Seat Sofa Set with Chaise for Living Room, Bedroom and Apartment, Black delivers everyday usability where it matters. measuring 108"D x 108"W x 35.5"H, weighing 1750 Pounds, available in Chenille - Black. Notable features include cloud couch and couch delivers, contributing to its space-saving character.

Key Features

  • Cloud Couch Delivers Cloud-like Comfort: Enjoy the generous 56-inch seat depth and 30-inch ottoman—significantly deeper than others, perfect for stretching out or curling up. The dual-layer cushions combine high-resilience foam with plush filling for lasting luxury. Three adjustable back cushions and four detachable armrest pillows provide personalized support. The ergonomic design reduces pressure points, ensuring long-lasting comfort for everyone—ideal for extended lounging sessions
  • Fully Modular Design for Customizable Layouts: This modular sofa offers unmatched flexibility, with an overall size of 101"W x 101"D x 35.5"H and seating for 5+ people. You can easily customize the seating arrangement to fit your space and lifestyle. Its rearrangeable components make refreshing the look of your living room effortless, making this cloud sofa both a chic and practical addition to your home. Enjoy the freedom to design your ideal lounging area with this innovative sectional sofa
  • Premium Fabrics in 7 Color Options: Choose from modern chenille or retro corduroy—both fabrics are soft, gentle on the skin, pet-friendly, and easy to maintain. Available in 7 vibrant or neutral colors, it matches perfectly with any decor style. Whether your style is minimalist or vintage-inspired, this 5 seater sectional couch will add elegance to your space. Note: Slight color variations may occur due to lighting or monitor differences
  • Two Sets of Sofa Legs & Effortless Assembly: This oversized couch comes with two leg height options—2.76" and 4.72"—so you can customize the height to suit your preference. Choose the lower height for a relaxed look, or the higher height for easier access, which also allows robot vacuums to clean underneath with ease. Assembly is simple: with clear instructions and all the necessary tools included, you can have it setup in just 30 minutes with no extra equipment required
  • Durable Construction & Customer-Centric Support: The sofa frame (armrests, backrests, and seat frames) is made from FSC-certified wood, with self-developed reinforced components, our modular sectional sofa offers better stability than others, making it ideal for all body types. This big comfy couch will be delivered in 4 boxes, please check all parts before assembly. If you're not satisfied with the sofa you received, please feel free to contact our customer service team

Why Choose the Vesgantti 101" V-Shaped Corner Couch Sectional

The Vesgantti 101" V-Shaped Corner Couch Sectional, 7 Seat Customizable Modular Cloud Couches with Movable Ottoman, Chenille Deep Seat Sofa Set with Chaise for Living Room, Bedroom and Apartment, Black earns recommendations through its stylish approach and cloud couch, both contributing to consistent long-term durability.

Best For

The Vesgantti 101" V-Shaped Corner Couch Sectional is best suited for: stretching out or curling up, all body types.

Quick Summary

The Vesgantti 101" V-Shaped Corner Couch Sectional is a Sofas & Couches product by Vesgantti. Brand: Vesgantti. Assembly Required: Yes. Seat Depth: 56 inches. Seat Height: 21 Inches. Weight Limit: 1750 Pounds. Price: $1319.99.

Product Specifications

Specification Details
Brand Vesgantti
Assembly Required Yes
Seat Depth 56 inches
Seat Height 21 Inches
Weight Limit 1750 Pounds
Seating Capacity 7
Product Dimensions 108"D x 108"W x 35.5"H
Item Weight 35 Kilograms
Type Sectional
Color Chenille - Black

Made with care

Great value

Elegant design

Quality materials

Details

This product is crafted with quality materials to ensure durability and performance. Designed with your convenience in mind, it seamlessly fits into your everyday life.

Shipping & Returns

We strive to process and ship all orders in a timely manner, working diligently to ensure that your items are on their way to you as soon as possible.

We are committed to ensuring a positive shopping experience for all our customers. If for any reason you wish to return an item, we invite you to reach out to our team for assistance, and we will evaluate every return request with care and consideration.

Play video

Shop The Full Collection

#WEJOY Folding Lounge Chair Outdoor, 5-Position Adjustable Sunbathing Tanning

#WEJOY Folding Lounge Chair Outdoor, 5-Position Adjustable Sunbathing Tanning

#WEJOY Folding Lounge Chair Outdoor, 5-Position Adjustable Sunbathing Tanning

#WEJOY Folding Lounge Chair Outdoor, 5-Position Adjustable Sunbathing Tanning

#WEJOY Folding Lounge Chair Outdoor, 5-Position Adjustable Sunbathing Tanning

#WEJOY Folding Lounge Chair Outdoor, 5-Position Adjustable Sunbathing Tanning

#WEJOY Tanning Chair with Face Hole & Canopy & Side Table, 5 Positions

#WEJOY Tanning Chair with Face Hole & Canopy & Side Table, 5 Positions