Product Overview
The Vesgantti 114" Boneless Modular Sectional Sofa, Modern U Shaped 5 Seater Couch with 2 Ottoman & Deep Seat, Convertible Chenille Cloud Couches for Living Room, No Assembly Required, Beige reflects durable thinking, providing everyday usability suitable for living rooms. measuring 66.9"D x 114"W x 31.5"H, weighing 2750 Pounds, available in Beige. Notable features include flexible modular and modular design, contributing to its comfortable character.
Key Features
- Flexible Modular Design: The U shaped sectional sofa has 5 separate sections. Each module can be easily moved and reassembled into loveseat, L shaped or U shaped sofa, chaise lounge, sleeper sofa, or oversized family sectional couch to match your lifestyle. The modular design allows you to freely create your ideal layout and adapt to ever-changing spaces. All modular seats have a anti-slip design on the bottom to prevent the sofa from sliding during daily use
- Spacious & Comfortable: The 114 inch modular sofa features 31.5 inch width and 29.5 inch deep seats, providing ample seating space to lounge for you and your family, especially perfert for heavy people. 9.8 inch wide armrests is an ideal place for placing drinks or laptop. The setional couch can easily transforms any room into a warm and comfortable haven for relaxing, entertaining guests, or enjoying a family movie night
- Durable and Long-lasting Support: This modern sofa is crafted entirely from high-resilience foam, providing lasting support and ultimate comfort. The foam utilizes quick rebound technology, maintaining its shape after prolonged use while providing a comfortable and stable seat. This full foam couch is perfect for a living room, bedroom, office, apartment, guest rooms, and children's play areas, encouraging children to play on its luxurious surface
- Premium Chenille Fabric: The modular sectional sofa is made of high-quality chenille fabric, which is soft, pill-resistant and pet-friendly; ensuring long-term durability and making it perfect for daily use. The stylish and solid color design adds a touch of luxury and enhances the beauty of your living space. We have a variety of colors for option to meet different decoration styles (Note: Colors may vary slightly due to lighting or monitor settings)
- No Assembly Required: No tools or complicated setup are required. Our modular couch is vacuum-packed; just simply unpack, gently pat the sections, and wait 72 hours for fully expand. Ultimate comfort and convenience are at your fingertips. The boneless sofa is packaged in 2 boxes, which may arrive on different days. Before assembling, please check all packages. If you have any questions or are dissatisfied with our sofa, please feel free to contact us
Why Choose the Vesgantti 114" Boneless Modular Sectional Sofa
Picking the Vesgantti 114" Boneless Modular Sectional Sofa, Modern U Shaped 5 Seater Couch with 2 Ottoman & Deep Seat, Convertible Chenille Cloud Couches for Living Room, No Assembly Required, Beige means choosing minimalist engineering with long-term durability. The flexible modular reinforces its position in the sofas & couches space.
Best For
The Vesgantti 114" Boneless Modular Sectional Sofa is best suited for: Non Slip, a living room, daily use.
Quick Summary
The Vesgantti 114" Boneless Modular Sectional Sofa is a Sofas & Couches product by Vesgantti. Brand: Vesgantti. Assembly Required: No. Weight Limit: 2750 Pounds. Seating Capacity: 5. Product Dimensions: 66.9"D x 114"W x 31.5"H. Price: $879.99.
Product Specifications
| Specification | Details |
|---|---|
| Brand | Vesgantti |
| Assembly Required | No |
| Weight Limit | 2750 Pounds |
| Seating Capacity | 5 |
| Product Dimensions | 66.9"D x 114"W x 31.5"H |
| Item Weight | 77.3 Pounds |
| Type | Sectional |
| Color | Beige |
| Special Feature | Non Slip |
| Room Type | Bedroom, Guest Room, Home Office, Living Room |