Vesgantti 118" Modular Sectional Couch, Comfy Corduroy Upholstered Cloud Couches by Vesgantti

Vesgantti 118" Modular Sectional Couch, Comfy Corduroy Upholstered Cloud Couches

$329.99
Sale price  $329.99 Regular price 
Skip to product information
Vesgantti 118" Modular Sectional Couch, Comfy Corduroy Upholstered Cloud Couches by Vesgantti

Vesgantti 118" Modular Sectional Couch, Comfy Corduroy Upholstered Cloud Couches

$329.99
Sale price  $329.99 Regular price 
Shipping calculated at checkout.

Product Overview

The Vesgantti 118" Modular Sectional Couch, Comfy Corduroy Upholstered Cloud Couches for Living Room, Modern 3 Seater Sofa with Deep Seat, Beige reflects ergonomic thinking, providing lasting comfort suitable for bedrooms. measuring 40.6"D x 118"W x 31.5"H, weighing 700 Pounds, available in Beige. Notable features include comfortable seating and 118 inch, contributing to its comfortable character.

Key Features

  • Spacious and Comfortable Seating: Our 118 inch oversized couch features 25.2 inch deep seating area, creating a ample leisure space for you and your family. This cloud couch is designed with double-layered high-resilience foam seat cushions, thick back cushions, providing ergonomic support for your waist and back. The extremely soft seat cushions make you feel like you're in the clouds, making the sofa an ideal choice for relaxation
  • Premium Corduroy Fabric: The modular sofa is upholstered in wrinkle-resistant & soft corduroy fabric, which feels silky soft to touch. The impressive durability and stain-fighting prowess of corduroy fabric keep your sectional sofas looking fresh and lively, perfet for homes with children or pets. We have multiple colors for option to match different decoration styles for fully meeting your personalized needs. Tips: There may be slight color difference due to light or display reasons
  • Convertible Modular Sectional Sofa: This modular couches allows you to customize the layout to fit your space and lifestyle. The simple solid color design makes this sofa to easily blend into different decoration style and occasions, whether it's the living room, bedroom, office and children's play areas
  • No Assembly Required: Vesgantti cloud sofa arrives tool-free and vacuum-packed for effortless setup. This modular sofa will be delivered in 2 boxes. Simply unbox, allow it to expand for up to 72 hours, and it’s ready to enjoy! Note: Minor wrinkles are normal after compression, and cushions may take up to three days to fully regain their fluffiness
  • Durable and Long-lasting Support: This modern sofa is crafted from high-resilience foam, providing lasting support and ultimate comfort. The foam utilizes quick rebound technology, maintaining its shape after prolonged use while providing a comfortable and stable seat. This full foam couch is perfect for a living room, bedroom, office, apartment, guest rooms, and children's play areas, encouraging children to play on its luxurious surface

Why Choose the Vesgantti 118" Modular Sectional Couch

Buyers gravitate toward the Vesgantti 118" Modular Sectional Couch, Comfy Corduroy Upholstered Cloud Couches for Living Room, Modern 3 Seater Sofa with Deep Seat, Beige for the practical reasons: minimalist construction, comfortable seating, and the simple assembly that results.

Best For

The Vesgantti 118" Modular Sectional Couch is best suited for: a living room.

Quick Summary

The Vesgantti 118" Modular Sectional Couch is a Sofas & Couches product by Vesgantti. Brand: Vesgantti. Assembly Required: No. Seat Depth: 25.2 inches. Seat Height: 20 Inches. Weight Limit: 700 Pounds. Price: $329.99.

Product Specifications

Specification Details
Brand Vesgantti
Assembly Required No
Seat Depth 25.2 inches
Seat Height 20 Inches
Weight Limit 700 Pounds
Seating Capacity 4
Product Dimensions 40.6"D x 118"W x 31.5"H
Item Weight 70.6 Pounds
Type Sectional
Color Beige

Made with care

Great value

Elegant design

Quality materials

Details

This product is crafted with quality materials to ensure durability and performance. Designed with your convenience in mind, it seamlessly fits into your everyday life.

Shipping & Returns

We strive to process and ship all orders in a timely manner, working diligently to ensure that your items are on their way to you as soon as possible.

We are committed to ensuring a positive shopping experience for all our customers. If for any reason you wish to return an item, we invite you to reach out to our team for assistance, and we will evaluate every return request with care and consideration.

Play video

Shop The Full Collection

#WEJOY Folding Lounge Chair Outdoor, 5-Position Adjustable Sunbathing Tanning

#WEJOY Folding Lounge Chair Outdoor, 5-Position Adjustable Sunbathing Tanning

#WEJOY Folding Lounge Chair Outdoor, 5-Position Adjustable Sunbathing Tanning

#WEJOY Folding Lounge Chair Outdoor, 5-Position Adjustable Sunbathing Tanning

#WEJOY Folding Lounge Chair Outdoor, 5-Position Adjustable Sunbathing Tanning

#WEJOY Folding Lounge Chair Outdoor, 5-Position Adjustable Sunbathing Tanning

#WEJOY Tanning Chair with Face Hole & Canopy & Side Table, 5 Positions

#WEJOY Tanning Chair with Face Hole & Canopy & Side Table, 5 Positions