Vesgantti 142" U Shaped Sectional Couch, Comfy Cloud Modular Sectional Sofa by Vesgantti

Vesgantti 142" U Shaped Sectional Couch, Comfy Cloud Modular Sectional Sofa

$945.99
Sale price  $945.99 Regular price 
Skip to product information
Vesgantti 142" U Shaped Sectional Couch, Comfy Cloud Modular Sectional Sofa by Vesgantti

Vesgantti 142" U Shaped Sectional Couch, Comfy Cloud Modular Sectional Sofa

$945.99
Sale price  $945.99 Regular price 
Shipping calculated at checkout.

Product Overview

The Vesgantti 142" U Shaped Sectional Couch, Comfy Cloud Modular Sectional Sofa with 2 Ottoman Deep Seat Chenille Modern Cloud Sofa, Modular Sofas for Living Room, Bedroom and Apartment, Gray responds to dining areas with long-lasting characteristics and long-term durability that hold up. measuring 60"D x 142"W x 35.5"H, weighing 1500 Pounds, available in Chenille - Gray. Notable features include cloud couch and couch delivers, contributing to its sleek character.

Key Features

  • Cloud Couch Delivers Cloud-like Comfort: Enjoy the generous 26-inch seat depth and 30-inch ottoman—significantly deeper than others, perfect for stretching out or curling up. The dual-layer cushions combine high-resilience foam with plush filling for lasting luxury. Four adjustable back cushions and two detachable armrest pillows provide personalized support. The ergonomic design reduces pressure points, ensuring long-lasting comfort for everyone—ideal for extended lounging sessions
  • Fully Modular Design for Customizable Layouts: This modular sofa offers unmatched flexibility, with an overall size of 142"W x 60"D x 35.5"H and seating for 2–4 people. You can easily customize the seating arrangement to fit your space and lifestyle. Its rearrangeable components make refreshing the look of your living room effortless, making this cloud sofa both a chic and practical addition to your home. Enjoy the freedom to design your ideal lounging area with this innovative sectional sofa
  • Premium Fabrics in 7 Color Options: Choose from modern chenille or retro corduroy—both fabrics are soft, gentle on the skin, pet-friendly, and easy to maintain. Available in 7 vibrant or neutral colors, it matches perfectly with any decor style. Whether your style is minimalist or vintage-inspired, this modern couch will add elegance to your space. Note: Slight color variations may occur due to lighting or monitor differences
  • Two Sets of Sofa Legs & Effortless Assembly: This sectional couch comes with two leg height options—2.76" and 4.72"—so you can customize the height to suit your preference. Choose the lower height for a relaxed look, or the higher height for easier access, which also allows robot vacuums to clean underneath with ease. Assembly is simple: with clear instructions and all the necessary tools included, you can have it setup in just 30 minutes with no extra equipment required
  • Durable Construction & Customer-Centric Support: The sofa frame (armrests, backrests, and seat frames) is made from FSC-certified wood, with self-developed reinforced components, our modular sectional sofa offers better stability than others, making it ideal for all body types. This U-shaped couch will be delivered in 3 boxes, please check all parts before assembly. If you're not satisfied with the sofa you received, please feel free to contact our customer service team

Why Choose the Vesgantti 142" U Shaped Sectional Couch

For shoppers comparing sofas & couches options, the Vesgantti 142" U Shaped Sectional Couch, Comfy Cloud Modular Sectional Sofa with 2 Ottoman Deep Seat Chenille Modern Cloud Sofa, Modular Sofas for Living Room, Bedroom and Apartment, Gray provides space-saving quality alongside cloud couch — together they support lasting comfort.

Best For

The Vesgantti 142" U Shaped Sectional Couch is best suited for: stretching out or curling up, all body types.

Quick Summary

The Vesgantti 142" U Shaped Sectional Couch is a Sofas & Couches product by Vesgantti. Brand: Vesgantti. Assembly Required: Yes. Seat Depth: 26 inches. Weight Limit: 1500 Pounds. Seating Capacity: 4. Price: $945.99.

Product Specifications

Specification Details
Brand Vesgantti
Assembly Required Yes
Seat Depth 26 inches
Weight Limit 1500 Pounds
Seating Capacity 4
Product Dimensions 60"D x 142"W x 35.5"H
Item Weight 35 Kilograms
Type Sectional
Color Chenille - Gray
Style Modern

Made with care

Great value

Elegant design

Quality materials

Details

This product is crafted with quality materials to ensure durability and performance. Designed with your convenience in mind, it seamlessly fits into your everyday life.

Shipping & Returns

We strive to process and ship all orders in a timely manner, working diligently to ensure that your items are on their way to you as soon as possible.

We are committed to ensuring a positive shopping experience for all our customers. If for any reason you wish to return an item, we invite you to reach out to our team for assistance, and we will evaluate every return request with care and consideration.

Play video

Shop The Full Collection

#WEJOY Folding Lounge Chair Outdoor, 5-Position Adjustable Sunbathing Tanning

#WEJOY Folding Lounge Chair Outdoor, 5-Position Adjustable Sunbathing Tanning

#WEJOY Folding Lounge Chair Outdoor, 5-Position Adjustable Sunbathing Tanning

#WEJOY Folding Lounge Chair Outdoor, 5-Position Adjustable Sunbathing Tanning

#WEJOY Folding Lounge Chair Outdoor, 5-Position Adjustable Sunbathing Tanning

#WEJOY Folding Lounge Chair Outdoor, 5-Position Adjustable Sunbathing Tanning

#WEJOY Tanning Chair with Face Hole & Canopy & Side Table, 5 Positions

#WEJOY Tanning Chair with Face Hole & Canopy & Side Table, 5 Positions