Vesgantti 159" Large Modular Sectional Sofa, U-Shaped Corduroy Cloud Couch by Vesgantti

Vesgantti 159" Large Modular Sectional Sofa, U-Shaped Corduroy Cloud Couch

$1,119.98
Sale price  $1,119.98 Regular price 
Skip to product information
Vesgantti 159" Large Modular Sectional Sofa, U-Shaped Corduroy Cloud Couch by Vesgantti

Vesgantti 159" Large Modular Sectional Sofa, U-Shaped Corduroy Cloud Couch

$1,119.98
Sale price  $1,119.98 Regular price 
Shipping calculated at checkout.

Product Overview

Buyers focused on small spaces appreciate the Vesgantti 159" Large Modular Sectional Sofa, U-Shaped Corduroy Cloud Couch with Deep Seats & Spring Support, 4-Seater Boneless Sofa with 2 Movable Ottomans, No Assembly Needed, Grey for its ergonomic quality and simple assembly. measuring 79.6"D x 159"W x 32.3"H, weighing 1200 pounds, available in 159" - 4 Seater + 2 Ottoman Grey. Notable features include modular sectional and sectional custom, contributing to its modern character.

Key Features

  • Modular Sectional, Custom Layout: This 159" U-shaped sectional offers full modular flexibility for any living space. Arrange as a 2-seat loveseat, 3-seat L-shaped sofa, or full 4-seat L/U-shaped setup. Modules can also be separated or transformed into a sofa bed, giving you versatile seating for any room
  • Oversized Deep Seat Comfort: Relax in true cloud-like comfort. Extra-deep seats and ergonomic height make lounging, stretching, and family movie nights effortless and cozy. Perfect for everyday comfort and gatherings
  • Durable Spring & Foam Support: Built with high-density foam and reinforced sinuous springs, this sectional provides balanced support and long-lasting durability. Resists sagging and ensures consistent comfort for all body types
  • Soft & Durable Corduroy Fabric: Upholstered in premium corduroy, this boneless sectional is soft, breathable, and resistant to wear and scratches. Family- and pet-friendly, combining comfort with practical style
  • Convertible with Movable Ottomans: Includes two movable ottomans to create chaise lounges, L-shaped, or U-shaped setups. Adaptable design lets you entertain, relax, or even create a sofa bed configuration with ease
  • No Assembly, Easy Setup: Ships in 6 manageable boxes for safe delivery. No tools or complicated instructions needed—just place the modules and allow foam to fully expand within 72 hours for instant, hassle-free comfort

Why Choose the Vesgantti 159" Large Modular Sectional Sofa

What distinguishes the Vesgantti 159" Large Modular Sectional Sofa, U-Shaped Corduroy Cloud Couch with Deep Seats & Spring Support, 4-Seater Boneless Sofa with 2 Movable Ottomans, No Assembly Needed, Grey is the combination of durable design and modular sectional. Users benefit from home aesthetics, making it a strong pick among sofas & couches options.

Best For

The Vesgantti 159" Large Modular Sectional Sofa is best suited for: everyday comfort and gatherings.

Quick Summary

The Vesgantti 159" Large Modular Sectional Sofa is a Sofas & Couches product by Vesgantti. Brand: Vesgantti. Seat Depth: 21.7 inches. Seat Height: 17.3 inches. Weight Limit: 1200 pounds. Seating Capacity: 4. Price: $1119.98.

Product Specifications

Specification Details
Brand Vesgantti
Seat Depth 21.7 inches
Seat Height 17.3 inches
Weight Limit 1200 pounds
Seating Capacity 4
Product Dimensions 79.6"D x 159"W x 32.3"H
Item Weight 46 pounds
Type Sectional
Color 159" - 4 Seater + 2 Ottoman Grey
Style Modern

Made with care

Great value

Elegant design

Quality materials

Details

This product is crafted with quality materials to ensure durability and performance. Designed with your convenience in mind, it seamlessly fits into your everyday life.

Shipping & Returns

We strive to process and ship all orders in a timely manner, working diligently to ensure that your items are on their way to you as soon as possible.

We are committed to ensuring a positive shopping experience for all our customers. If for any reason you wish to return an item, we invite you to reach out to our team for assistance, and we will evaluate every return request with care and consideration.

Play video

Shop The Full Collection

0-100 Psi Water Pressure Gauge Test

0-100 Psi Water Pressure Gauge Test

0-100 Psi Water Pressure Gauge Test

$31.98
Sale price  $31.98 Regular price 
0-100 Psi Water Pressure Gauge Test

0-100 Psi Water Pressure Gauge Test

0-100 Psi Water Pressure Gauge Test

$33.98
Sale price  $33.98 Regular price 
0-14 pH Electrode Probe, pH Meter

0-14 pH Electrode Probe, pH Meter

0-14 pH Electrode Probe, pH Meter

$37.18
Sale price  $37.18 Regular price 
0-200 Psi Water Pressure Gauge Test

0-200 Psi Water Pressure Gauge Test

0-200 Psi Water Pressure Gauge Test

$33.98
Sale price  $33.98 Regular price