Vesgantti 68" Loveseat Sofa by Vesgantti

Vesgantti 68" Loveseat Sofa

$670.00
Sale price  $670.00 Regular price 
Skip to product information
Vesgantti 68" Loveseat Sofa by Vesgantti

Vesgantti 68" Loveseat Sofa

$670.00
Sale price  $670.00 Regular price 
Shipping calculated at checkout.

Product Overview

The Vesgantti 68" Loveseat Sofa with Movable Ottoman, Comfy Corduroy Couch with Spring Cushion, Sofa Couch with Solid Wood, Modern Office Sofa with Deep Seat for Living Room and Bedroom, Green hits the sweet spot of durable construction and modern style, ideal for kids rooms. measuring 56.3"D x 68"W x 35"H, weighing 772 pounds, available in 68" - 2 Seater & 1 Ottoman Green. Notable features include movable ottoman and sofa couch, contributing to its multi-functional character.

Key Features

  • Sofa with Movable Ottoman - This sofa couch with a movable ottoman offers versatile configurations—turn it into an L-shaped sectional for division or use the ottoman alone as a footrest or extra seat. Flexible for living rooms, apartments, or bedrooms, its practical design and sleek look easily enhance any space, letting you create personalized setups
  • FSC Certified Solid Wood - Made with materials from well-managed forests that support sustainable forestry practices. This loveseat sofa is known for its sturdiness and solidity, with a maximum weight capacity of 772 lbs. Additionally, the sofa couch features non-slip protective backing on the bottom of the legs, providing stability and preventing damage to flooring
  • Ergonomic & Comfortable - The spring cushions of this corduroy couch absorb the impact of daily use, preventing rapid wear and tear and extending the life of the sofa couch. Its 21.3-inch seat depth shines, providing ample support for both upright and reclining seating, while the matching 26.3-inch ottoman enhances relaxation by providing leg support or additional seating, which together ensure excellent lumbar support and pressure relief, making every moment of relaxation feel relaxed and luxurious
  • Durable Corduroy Fabric - This corduroy sofa couch has a unique pattern and texture, characterised by parallel ridges that give it a smooth and soft feel. The modern couch has a clear and rounded velvet-like surface, which adds to its luxurious appearance. Additionally, sectional couch is thick and wear-resistant, making it an excellent choice for those who demand comfort and durability
  • Shipped in 2 Separate Packages - kindly allow for their arrival at different times. Slight color/size variations may occur due to displays/manual measurements. Easy 30-min assembly without additional tools. Cushions take 24-48 hours to fully recover due to compressed packaging. You can pat the cushion to make it fluffy and feel better. Contact us with questions

Why Choose the Vesgantti 68" Loveseat Sofa with Movable Ottoman

The Vesgantti 68" Loveseat Sofa with Movable Ottoman, Comfy Corduroy Couch with Spring Cushion, Sofa Couch with Solid Wood, Modern Office Sofa with Deep Seat for Living Room and Bedroom, Green earns its place through sturdy quality and thoughtful features including movable ottoman. The result is space optimization that lasts.

Best For

When dining areas is the priority, the Vesgantti 68" Loveseat Sofa with Movable Ottoman, Comfy Corduroy Couch with Spring Cushion, Sofa Couch with Solid Wood, Modern Office Sofa with Deep Seat for Living Room and Bedroom, Green stands out for sleek engineering and long-term durability.

Quick Summary

The Vesgantti 68" Loveseat Sofa with Movable Ottoman is a Sofas & Couches product by Vesgantti. Brand: Vesgantti. Seat Depth: 21.3 inches. Seat Height: 5.5 inches. Weight Limit: 772 pounds. Seating Capacity: 2. Price: $670.

Product Specifications

Specification Details
Brand Vesgantti
Seat Depth 21.3 inches
Seat Height 5.5 inches
Weight Limit 772 pounds
Seating Capacity 2
Product Dimensions 56.3"D x 68"W x 35"H
Item Weight 105.6 pounds
Leg Length 5.9 inches
Type Loveseat
Color 68" - 2 Seater & 1 Ottoman Green

Made with care

Great value

Elegant design

Quality materials

Details

This product is crafted with quality materials to ensure durability and performance. Designed with your convenience in mind, it seamlessly fits into your everyday life.

Shipping & Returns

We strive to process and ship all orders in a timely manner, working diligently to ensure that your items are on their way to you as soon as possible.

We are committed to ensuring a positive shopping experience for all our customers. If for any reason you wish to return an item, we invite you to reach out to our team for assistance, and we will evaluate every return request with care and consideration.

Play video

Shop The Full Collection

0-100 Psi Water Pressure Gauge Test

0-100 Psi Water Pressure Gauge Test

0-100 Psi Water Pressure Gauge Test

$31.98
Sale price  $31.98 Regular price 
0-100 Psi Water Pressure Gauge Test

0-100 Psi Water Pressure Gauge Test

0-100 Psi Water Pressure Gauge Test

$33.98
Sale price  $33.98 Regular price 
0-14 pH Electrode Probe, pH Meter

0-14 pH Electrode Probe, pH Meter

0-14 pH Electrode Probe, pH Meter

$37.18
Sale price  $37.18 Regular price 
0-200 Psi Water Pressure Gauge Test

0-200 Psi Water Pressure Gauge Test

0-200 Psi Water Pressure Gauge Test

$33.98
Sale price  $33.98 Regular price