Product Overview
The Vesgantti 97" L-Shape Modular Sofa, 3-Seat Corduroy Couch with Movable Ottoman, Sectional Sofa for Living Room, Green balances utility and everyday usability through ergonomic thinking applied to living rooms. measuring 30"D x 96.8"W x 31.5"H, weighing 800 Pounds, available in 97" - 3 Seater & Ottoman Green. Notable features include modular sectional and sectional sofa, contributing to its modern character.
Key Features
- Modular Sectional Sofa: Comes with a removable ottoman, giving you multiple ways to set it up: you can arrange it into a cozy L-shaped sectional, or use the ottoman on its own—as a footrest, a 3-seater couch, or extra seating. It’s easy to rearrange to fit your space, making it perfect for living rooms, apartments, and even bedrooms. With its practical flexibility and sleek design, it effortlessly boosts the vibe of any room, so you can create a personalized layout without hassle
- FSC-certified Solid Wood:Crafted from materials sourced from responsibly managed forests to uphold sustainable forestry standards. Renowned for its robust build and durability, it boasts a maximum weight capacity of 800 lbs. What’s more, the sofa legs are equipped with non-slip protective pads on the bottom, ensuring stability while safeguarding your flooring from scratches or damage
- Ergonomic & Comfortable: The L-shaped sofa’s spring cushions absorb daily impact, reducing wear and tear to extend the sofa’s lifespan. Its 21-inch seat depth is a standout feature, offering ample support whether you’re sitting upright or reclining. Paired with the matching 26.4-inch ottoman—ideal for leg support or extra seating—this set delivers excellent lumbar support and pressure relief, making every moment of relaxation feel both comfortable and luxurious
- Durable Corduroy Fabric: Upholstered in corduroy, this sofa features a unique pattern and texture defined by parallel ridges, delivering a smooth, soft touch. The modern design is elevated by its clear, rounded, velvet-like surface, which enhances the sofa’s luxurious look. What’s more, the thick corduroy material is highly wear-resistant, making this sectional a top choice for anyone seeking both long-lasting durability and everyday comfort
- Shipped in 2 Separate Packages: Please note that the two packages may arrive at different times. Minor color or size differences could occur due to varying display settings or manual measurement. Assembly is simple and takes only 30 minutes, with no extra tools required. Due to compressed packaging, the cushions will need 24–48 hours to fully expand; gently patting them can help restore their fluffiness for better comfort. Feel free to reach out to us if you have any questions
Why Choose the Vesgantti 97" L-Shape Modular Sofa
Consistently chosen by sofas & couches buyers, the Vesgantti 97" L-Shape Modular Sofa, 3-Seat Corduroy Couch with Movable Ottoman, Sectional Sofa for Living Room, Green delivers durable construction alongside modular sectional for reliable long-term durability.
Best For
The Vesgantti 97" L-Shape Modular Sofa is best suited for: living rooms, leg support or extra seating—this set delivers excellent lumbar support and pressure relief.
Quick Summary
The Vesgantti 97" L-Shape Modular Sofa is a Sofas & Couches product by Vesgantti. Brand: Vesgantti. Assembly Required: Yes. Seat Depth: 21 inches. Seat Height: 19.7 Inches. Weight Limit: 800 Pounds. Price: $549.99.
Product Specifications
| Specification | Details |
|---|---|
| Brand | Vesgantti |
| Assembly Required | Yes |
| Seat Depth | 21 inches |
| Seat Height | 19.7 Inches |
| Weight Limit | 800 Pounds |
| Seating Capacity | 4 |
| Product Dimensions | 30"D x 96.8"W x 31.5"H |
| Item Weight | 158.1 Pounds |
| Type | Sectional |
| Color | 97" - 3 Seater & Ottoman Green |