Product Overview
A durable solution for small spaces, the Vesgantti Modular 6-Seater Chenille L Shaped Sectional Sofa, Beige offers simple assembly where it counts. measuring 126.76"D x 112.59"W x 31.5"H, weighing 250 pounds, available in Chenille-beige. Notable features include spacious modular and modular design, contributing to its minimalist character.
Key Features
- Spacious Modular Design: Dimensions: L 126.76" W 112.59" H 31.50". This 7 seater sectional sofa offers generous seating for family gatherings, movie nights, and guests. This versatile sectional couch blends style and function as sectional couches for living room. This modular sectional sofa supports flexible layouts, including l shaped couch, U shaped couch, or custom configurations
- Smart Storage & Convenience: Built for modern living, this corner sofa includes USB charging ports, dual cup holders, a hidden storage console, and spacious armrest compartments. Whether storing remotes, books, tablets, blankets, or daily essentials, this modular sofa with storage keep everything organized and within easy reach. The thoughtful storage design helps reduce clutter while adding convenience to your everyday relaxation and entertainment experience
- Premium Chenille Comfort: Upholstered in soft and durable chenille imitation linen fabric, this sofa comfy couch offers lasting comfort and performance. Built with high-density weaving, this beige couch provides strong wear and scratch resistance, helping prevent pilling, scuffs, and long-term sagging from daily use. Thick cushions, supportive seating, and widened armrests create a cozy space for reading, watching TV, or relaxing with family
- Durable Construction: Crafted with a sturdy solid wood frame, high-density foam, and supportive spring system, this sectional sofa with ottoman is built for lasting stability and comfort. The integrated sofa cup holder design adds functionality, while CertiPUR-US certified cushions are non-toxic, odor-free, and pet-friendly. Designed as versatile sofas para sala, this beige sofa complements a wide range of interior styles and family living spaces
- Multiple Package Delivery & Easy Assembly: This modern oversized sofa offers spacious seating and features a secure buckle connection system for easy setup. Designed for convenience and durability, this furniture sofas living room piece is simple to assemble and maintain. To better protect each component during transit, this sectional sofa is shipped in 6 separate packages, which may arrive at different times
Why Choose the Vesgantti Modular 6-Seater Chenille L Shaped Sectional Sofa
What distinguishes the Vesgantti Modular 6-Seater Chenille L Shaped Sectional Sofa, Beige is the combination of sleek design and spacious modular. Users benefit from home aesthetics, making it a strong pick among sofas & couches options.
Best For
The Vesgantti Modular 6-Seater Chenille L Shaped Sectional Sofa is best suited for: convenience and durability.
Quick Summary
The Vesgantti Modular 6-Seater Chenille L Shaped Sectional Sofa is a Sofas & Couches product by Vesgantti. Brand: Vesgantti. Seat Height: 17.7 inches. Weight Limit: 250 pounds. Seating Capacity: 7. Product Dimensions: 126.76"D x 112.59"W x 31.5"H. Price: $3599.96.
Product Specifications
| Specification | Details |
|---|---|
| Brand | Vesgantti |
| Seat Height | 17.7 inches |
| Weight Limit | 250 pounds |
| Seating Capacity | 7 |
| Product Dimensions | 126.76"D x 112.59"W x 31.5"H |
| Item Weight | 80.2 pounds |
| Leg Length | 2.36 inches |
| Type | Sectional |
| Color | Chenille-beige |
| Style | Modern |