Vesgantti Modular 6-Seater Chenille L Shaped Sectional Sofa, Light Grey by Vesgantti

Vesgantti Modular 6-Seater Chenille L Shaped Sectional Sofa, Light Grey

$3,199.96
Sale price  $3,199.96 Regular price 
Skip to product information
Vesgantti Modular 6-Seater Chenille L Shaped Sectional Sofa, Light Grey by Vesgantti

Vesgantti Modular 6-Seater Chenille L Shaped Sectional Sofa, Light Grey

$3,199.96
Sale price  $3,199.96 Regular price 
Shipping calculated at checkout.

Product Overview

The Vesgantti Modular 6-Seater Chenille L Shaped Sectional Sofa, Light Grey responds to living rooms with non-toxic characteristics and everyday usability that hold up. measuring 126.76"D x 99.21"W x 31.5"H, weighing 250 pounds, available in Chenille-light Gray. Notable features include spacious modular and modular design, contributing to its sleek character.

Key Features

  • Spacious Modular Design: Dimensions: L 126.76" W 99.21" H 31.50". This 7 seater sectional sofa offers generous seating for family gatherings, movie nights, and guests. This versatile sectional couch blends style and function as sectional couches for living room. This modular sectional sofa supports flexible layouts, including l shaped couch, U shaped couch, or custom configurations
  • Smart Storage & Convenience: Built for modern living, this corner sofa includes USB charging ports, dual cup holders, a hidden storage console, and spacious armrest compartments. Whether storing remotes, books, tablets, blankets, or daily essentials, this modular sofa with storage keep everything organized and within easy reach. The thoughtful storage design helps reduce clutter while adding convenience to your everyday relaxation and entertainment experience
  • Premium Chenille Comfort: Upholstered in soft and durable chenille imitation linen fabric, this sofa comfy couch offers lasting comfort and performance. Built with high-density weaving, this light grey couch provides strong wear and scratch resistance, helping prevent pilling, scuffs, and long-term sagging from daily use. Thick cushions, supportive seating, and widened armrests create a cozy space for reading, watching TV, or relaxing with family
  • Durable Construction: Crafted with a sturdy solid wood frame, high-density foam, and supportive spring system, this sectional sofa with ottoman is built for lasting stability and comfort. The integrated sofa cup holder design adds functionality, while CertiPUR-US certified cushions are non-toxic, odor-free, and pet-friendly. Designed as versatile sofas para sala, this light grey sofa complements a wide range of interior styles and family living spaces
  • Multiple Package Delivery & Easy Assembly: This modern oversized sofa offers spacious seating and features a secure buckle connection system for easy setup. Designed for convenience and durability, this furniture sofas living room piece is simple to assemble and maintain. To better protect each component during transit, this sectional sofa is shipped in 5 separate packages, which may arrive at different times

Why Choose the Vesgantti Modular 6-Seater Chenille L Shaped Sectional Sofa

For long-term sofas & couches use, the Vesgantti Modular 6-Seater Chenille L Shaped Sectional Sofa, Light Grey offers space-saving build, spacious modular, and long-term durability — a combination that pays off over time.

Best For

The Vesgantti Modular 6-Seater Chenille L Shaped Sectional Sofa is best suited for: convenience and durability.

Quick Summary

The Vesgantti Modular 6-Seater Chenille L Shaped Sectional Sofa is a Sofas & Couches product by Vesgantti. Brand: Vesgantti. Seat Height: 17.7 inches. Weight Limit: 250 pounds. Seating Capacity: 7. Product Dimensions: 126.76"D x 99.21"W x 31.5"H. Price: $3199.96.

Product Specifications

Specification Details
Brand Vesgantti
Seat Height 17.7 inches
Weight Limit 250 pounds
Seating Capacity 7
Product Dimensions 126.76"D x 99.21"W x 31.5"H
Item Weight 80.2 pounds
Leg Length 2.36 inches
Type Sectional
Color Chenille-light Gray
Style Modern

Made with care

Great value

Elegant design

Quality materials

Details

This product is crafted with quality materials to ensure durability and performance. Designed with your convenience in mind, it seamlessly fits into your everyday life.

Shipping & Returns

We strive to process and ship all orders in a timely manner, working diligently to ensure that your items are on their way to you as soon as possible.

We are committed to ensuring a positive shopping experience for all our customers. If for any reason you wish to return an item, we invite you to reach out to our team for assistance, and we will evaluate every return request with care and consideration.

Play video

Shop The Full Collection

0-100 Psi Water Pressure Gauge Test

0-100 Psi Water Pressure Gauge Test

0-100 Psi Water Pressure Gauge Test

$31.98
Sale price  $31.98 Regular price 
0-100 Psi Water Pressure Gauge Test

0-100 Psi Water Pressure Gauge Test

0-100 Psi Water Pressure Gauge Test

$33.98
Sale price  $33.98 Regular price 
0-14 pH Electrode Probe, pH Meter

0-14 pH Electrode Probe, pH Meter

0-14 pH Electrode Probe, pH Meter

$37.18
Sale price  $37.18 Regular price 
0-200 Psi Water Pressure Gauge Test

0-200 Psi Water Pressure Gauge Test

0-200 Psi Water Pressure Gauge Test

$33.98
Sale price  $33.98 Regular price