YINMIK PH Meter, Digital 4 in 1 PH EC TDS Temp Meter by YINMIKWaterTester

YINMIK PH Meter, Digital 4 in 1 PH EC TDS Temp Meter

$39.98
Sale price  $39.98 Regular price 
Skip to product information
YINMIK PH Meter, Digital 4 in 1 PH EC TDS Temp Meter by YINMIKWaterTester

YINMIK PH Meter, Digital 4 in 1 PH EC TDS Temp Meter

$39.98
Sale price  $39.98 Regular price 
Shipping calculated at checkout.

Product Overview

Built with well-made attention to detail, the YINMIK PH Meter, Digital 4 in 1 PH EC TDS Temp Meter for Water Hydroponics provides long-term value for gift giving. Notable features include multiparameter ph and ph ec, contributing to its value-driven character.

Key Features

  • Multiparameter pH EC TDS Temp Meters: Grower’s good aid. YK-4 Pen Meter can measure pH, EC (Electrical conductivity), TDS (total dissolved solids), don’t need others, just press {MODE/CAL} key to switch readings of pH, EC (μS/cm / mS/cm), TDS (ppm)
  • Easy to Calibrate-pH Meter: Automatic pH calibration. Supports 3-point pH CAL at 7.00, 4.00, 10.01. Comes with 2 sets of pH meter calibration powders (4&7&10) for your calibration needs, (EC and tds meters are pre-calibrated). {Easy to Read:} The large screen display with green Backlight helps to read the pH tds ec meter at odd angles and in low light. Press the {HOLD/TEMP} key to lock the reading, which helps to easily record readings
  • Multiple Uses-pH Tester: Multiparameter Meters can test pH, EC, tds levels and temperature of pH up and down in hydroponics to know your water is in the perfect range for maximum nutrient uptake. Widely used in DWC hydroponics system, RO/DI water, drinking water, tap water, beer, wine, kombucha, milk, home brewing, pool, aquarium, reef tank, hot tub, aquaculture, Spas, fish tank and urine
  • pH EC Meter with Stable and Reliable Reading: The additional chip makes the pH reading more stable (Reduce the interference of mobile phones and other items on the instrument), and the automatic temperature compensation (32 to 122 ℉) keeps the reading consistent
  • No Worries of pH PPM Meter: For YK-4 replacement pH Probe; it is available at YINMIK Store, save your maintenance cost; For Calibration, you can find pH 4.00 7.00 10.01 Calibration solution and calibration powder in YINMIK Store; If you need to calibrate EC later, You can come to YINMIK Store to choose EC 1413μS/cm and 12.88mS/cm calibration solution

Why Choose the YINMIKWaterTester YINMIK PH Meter

What makes the YINMIK PH Meter, Digital 4 in 1 PH EC TDS Temp Meter for Water Hydroponics compelling is the alignment between time-tested build, multiparameter ph, and the reliable performance they enable.

Best For

Geared toward gift giving, the YINMIK PH Meter, Digital 4 in 1 PH EC TDS Temp Meter for Water Hydroponics brings time-tested build quality and consistent long-term value.

Quick Summary

The YINMIKWaterTester YINMIK PH Meter is a pH Meters product by YINMIKWaterTester. Price: $39.98.

Made with care

Great value

Elegant design

Quality materials

Details

This product is crafted with quality materials to ensure durability and performance. Designed with your convenience in mind, it seamlessly fits into your everyday life.

Shipping & Returns

We strive to process and ship all orders in a timely manner, working diligently to ensure that your items are on their way to you as soon as possible.

We are committed to ensuring a positive shopping experience for all our customers. If for any reason you wish to return an item, we invite you to reach out to our team for assistance, and we will evaluate every return request with care and consideration.

Play video

Shop The Full Collection

0-100 Psi Water Pressure Gauge Test

0-100 Psi Water Pressure Gauge Test

0-100 Psi Water Pressure Gauge Test

$31.98
Sale price  $31.98 Regular price 
0-100 Psi Water Pressure Gauge Test

0-100 Psi Water Pressure Gauge Test

0-100 Psi Water Pressure Gauge Test

$33.98
Sale price  $33.98 Regular price 
0-14 pH Electrode Probe, pH Meter

0-14 pH Electrode Probe, pH Meter

0-14 pH Electrode Probe, pH Meter

$37.18
Sale price  $37.18 Regular price 
0-200 Psi Water Pressure Gauge Test

0-200 Psi Water Pressure Gauge Test

0-200 Psi Water Pressure Gauge Test

$33.98
Sale price  $33.98 Regular price